MicrostockGroup
Agency Based Discussion => Sites that no longer exist => Veer => Topic started by: Sadstock on January 02, 2012, 09:03
-
Just realized that in October, November, and December, I've had one review per month about 30 days apart, regardless of when I uploaded the images. Are they on a monthly review schedule per contributor rather then on a first uploaded first reviewed schedule?
-
Revew times for me aren't that predictable, but they have been running 2-4 weeks. There was a big catch-up review last week that cleared all but 2 from my queue - never had that large a chunk reviewed at once before and don't know why the two illustrations (JPEGS from vectors) got left in the queue.
-
A month or more.
I hope to review from the November 26 ... I wrote more than a week ago and they said they would answer in 1 or 2 days.
No answer. I'm waiting ....
-
I wonder are veer going to do something on the review? it is the only agency that take such a long time and now i started to get a lot of inconsistent rejections..
like new reason such as 'This image is too similar to images already on Veer.'